  • 配電箱安裝施工要點詳細介紹
  • 本站編輯:杭州建奧電器有限公司發(fā)布日期:2021-01-23 10:06 瀏覽次數(shù):

配電箱安裝施工要點

Key points of distribution box installation

(1)設備要求

(1) Equipment requirements

1)柜(盤)本體外觀檢查應無損傷及變形,油漆完整無損。柜(盤)內(nèi)部檢查:電器裝置及元件、絕緣瓷件齊全,無損傷、裂紋等缺陷。

1) The appearance inspection of cabinet (panel) body shall be free of damage and deformation, and the paint shall be intact. Cabinet (panel) internal inspection: electrical devices and components, insulation porcelain parts are complete, no damage, cracks and other defects.

2)安裝前應核對配電箱編號是否與安裝位置相符,按設計圖紙檢查其箱號、箱內(nèi)回路號。

2) Before installation, check whether the distribution box number is consistent with the installation position, and check the box number and circuit number according to the design drawings.

箱門接地應采用軟銅編織線,專用接線端子。箱內(nèi)接線應整齊,滿足設計要求及驗收規(guī)范

Soft copper braided wire and special terminal shall be used for box door grounding. The wiring in the box shall be neat and meet the design requirements and acceptance specifications

(GB50303-2002)的規(guī)定。

(GB 50303-2002).

(2)作業(yè)條件

(2) Operating conditions

配電箱安裝場所土建應具備內(nèi)粉刷完成、門窗已裝好的基本條件。

The civil engineering of the installation site of the distribution box should have the basic conditions for the completion of internal painting and the installation of doors and windows.

預埋管道及預埋件均應清理好;

The embedded pipes and embedded parts shall be cleaned;

場地具備運輸條件,保持道路平整暢通。

The site is equipped with transportation conditions to keep the road smooth.

(3)不銹鋼配電箱定位:根據(jù)設計要求現(xiàn)場確定配電箱位置以及現(xiàn)場實際設備安裝情況,按照箱的外形尺寸進行彈線定位。

(3) Positioning of stainless steel distribution box: according to the design requirements, determine the location of the distribution box and the actual equipment installation on site, and snap the line for positioning according to the external dimensions of the box.